Foundations

The footing was poured first, followed by the foundation a week later.
 

It is 8' high and 8 inches thick.
 

5 inches of styrofoam with a vapor barrier were installed to keep the frost out, establishing the heat sink.
 

The soil is heavily rocky. The boulder to the North (behind the greenhouse) was dug out of the foundation hole.